[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[Full-disclosure] nuclear plants reach software quality levels



<quote>
The research paper concluded that there was a roughly 10 percent chance that a 
tsunami could test or overrun the defenses of the Fukushima Daiichi nuclear 
power plant within a 50-year span based on the most conservative assumptions.
But Tokyo Electric did nothing to change its safety planning based on that 
study, which was presented at a nuclear engineering conference in Miami in July 
2007.
[1]
</quote>

on top of it their measuring devices overflowed:

<quote>
Those levels may be higher still, but authorities say 1,000 millisieverts is 
the upper limit of their measuring devices. [2]
</quote>

[1] 
http://www.reuters.com/article/2011/03/29/us-japa-nuclear-risks-idUSTRE72S2UA20110329
[2] 
http://online.wsj.com/article/SB10001424052748704471904576229854179642220.html#

_______________________________________________
Full-Disclosure - We believe in it.
Charter: http://lists.grok.org.uk/full-disclosure-charter.html
Hosted and sponsored by Secunia - http://secunia.com/